Kicking Horse Canyon Constructors


Phase 4

Duration: 3 Years

  • Slope stabilization and channel work

  • Drainage and culvert installation

  • Rip rap, gabion walls, and dumpsites

  • HDPE and FSR construction

CWP Constructors Ltd.


Poboktan Crk Bridge Rehab

Duration: 1 Year

  • Civil works including rip rap placement

  • Abutment excavation and backfilling

  • Grade preparation for asphalt placement

  • Topsoil placement and landscaping

Silverado Site Services Ltd.


Holt Crk Bridge

Duration: 1 Week

  • Removal and installation of a new 60foot steel girder bridge

  • Rip rap installation

  • Site grading and drainage

Ministry of Forests


Blaeberry FSR Rip Rap

Duration: 3 Months

  • Clearing and grubbing

  • Drill, blast, and sorting of rip rap (25 kg to 1,000 kg classes)

  • Hauling and placement of rip rap for future installation

Lake Louise Ski Area Ltd.


Redemption Ridge

Duration: 7 Months

  • Clearing, grubbing, and excavation

  • Foundation prep and fine grading

  • Rock breaking and tower base back-fill

  • Material transport, culverts, and drainage installation