Kicking Horse Canyon Constructors – Phase 4
Duration: 3 Years
Slope stabilization and channel work
Drainage and culvert installation
Rip rap, gabion walls, and dumpsites
HDPE and FSR construction
Poboktan Creek Bridge Rehabilitation
Duration: 1 Year
Civil works including rip rap placement
Abutment excavation and backfilling
Grade preparation for asphalt placement
Topsoil placement and landscaping
Holt Creek Bridge Project
Duration: 1 Week
Removal and installation of a new 60foot steel girder bridge
Rip rap installation
Site grading and drainage
Blaeberry FSR Rip Rap Project
Duration: 3 Months
Clearing and grubbing
Drill, blast, and sorting of rip rap (25 kg to 1,000 kg classes)
Hauling and placement of rip rap for future installation
Lake Louise Ski Area Ltd. Redemption Ridge
Duration: 7 Months
Clearing, grubbing, and excavation
Foundation prep and fine grading
Rock breaking and tower base back-fill
Material transport, culverts, and drainage installation